IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 33152 Nonferrous Metal Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0427 # 03 Y:2013 03 2013 USE SYNTHETIC LUBRICANT $1,748 $750 Implemented
BD0427 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,233 $2,210 Implemented
BD0425 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,547 $50,250 Implemented
BD0425 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,044 $3,000 Implemented
BD0425 # 08 Y:2013 08 2013 USE SYNTHETIC LUBRICANT $1,637 $600 Implemented
BD0425 # 03 Y:2013 03 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,154 $1,077 Implemented
BD0381 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,634 $40 Implemented
BD0381 # 10 Y:2010 10 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $591 $1,900 Implemented
BD0381 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $812 $2,060 Implemented
BD0381 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,069 $725 Implemented
BD0381 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $2,065 $1,350 Implemented
BD0381 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,137 $2,500 Implemented
BD0381 # 02 Y:2010 02 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $24,197 $70,000 Implemented
BD0346 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $833 $501 Implemented
BD0346 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,385 $10,001 Implemented
BD0346 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,447 $2,972 Implemented
IC0086 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,905 $2,900 Implemented
IC0086 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,738 $43,650 Implemented
IC0086 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,099 $2,050 Implemented
IC0086 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,044 $3,000 Implemented
IC0086 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,538 $0 Implemented
IC0086 # 01 Y:2004 01 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $59,927 $0 Implemented
BD0232 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,953 $0 Implemented
BD0232 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $794 $700 Implemented
BD0232 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $574 $1,050 Implemented