Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsNAICS | 33152 | Nonferrous Metal Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0509 # 07 Y:2006 | 07 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $7,000 | $11,000 | Implemented |
OR0509 # 02 Y:2006 | 02 | 2006 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $58,000 | $6,800 | Implemented |
OR0509 # 04 Y:2006 | 04 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $660 | $240 | Implemented |
OR0509 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,900 | $5,000 | Implemented |
OR0509 # 05 Y:2006 | 05 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,300 | $650 | Not Implemented |
OR0509 # 08 Y:2006 | 08 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,200 | $3,000 | Implemented |
OR0509 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $3,000 | $1,200 | Not Implemented |
OR0509 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,200 | $2,250 | Implemented |
OR0509 # 09 Y:2006 | 09 | 2006 | ADOPT IN-HOUSE MATERIAL GENERATION | $6,400 | $22,000 | Not Implemented |
WV0349 # 10 Y:2006 | 10 | 2006 | OPTIMIZE PLANT POWER FACTOR | $3,456 | $10,700 | Not Implemented |
WV0349 # 09 Y:2006 | 09 | 2006 | INSULATE BARE EQUIPMENT | $3,740 | $1,318 | Implemented |
WV0349 # 08 Y:2006 | 08 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,291 | $1,000 | Implemented |
WV0349 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,242 | $400 | Implemented |
WV0349 # 05 Y:2006 | 05 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,522 | $600 | Not Implemented |
WV0349 # 04 Y:2006 | 04 | 2006 | REDUCE VENTILATION AIR | $13,672 | $10,295 | Implemented |
WV0349 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $48,286 | $39,350 | Implemented |
WV0349 # 01 Y:2006 | 01 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $167,255 | $32,010 | Not Implemented |
WV0349 # 12 Y:2006 | 12 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $375 | $200 | Implemented |
WV0349 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,527 | $640 | Implemented |
WV0349 # 06 Y:2006 | 06 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,322 | $3,250 | Not Implemented |
WV0349 # 11 Y:2006 | 11 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $1,998 | $512 | Implemented |
UD0742 # 09 Y:2006 | 09 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $55,855 | $10,000 | Implemented |
UD0742 # 10 Y:2006 | 10 | 2006 | USE OPTIMUM THICKNESS INSULATION | $42,660 | $15,558 | Not Implemented |
UD0742 # 14 Y:2006 | 14 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $17,949 | $0 | Implemented |
UD0742 # 16 Y:2006 | 16 | 2006 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $7,083 | $0 | Implemented |