Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
49
matching recommendationsNAICS | 33152 | Nonferrous Metal Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0457 # 02 Y:2018 | 02 | 2018 | USE SOLAR HEAT FOR HEAT | $7,441 | $1,961 | Not Implemented |
AS0457 # 03 Y:2018 | 03 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,791 | $19,647 | Not Implemented |
AS0457 # 04 Y:2018 | 04 | 2018 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $4,539 | $2,530 | Not Implemented |
AS0457 # 05 Y:2018 | 05 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,412 | $2,750 | Not Implemented |
AS0457 # 06 Y:2018 | 06 | 2018 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,736 | $7,600 | Not Implemented |
AS0457 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,832 | $676 | Implemented |
AS0457 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,174 | $0 | Implemented |
UD0989 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $1,362 | $1,935 | Not Implemented |
UD0989 # 04 Y:2018 | 04 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,885 | $6,000 | Not Implemented |
UD0989 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,012 | $0 | Not Implemented |
UD0989 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,291 | $1,000 | Not Implemented |
UD0989 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,033 | $0 | Not Implemented |
MZ0254 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,370 | $57,615 | Implemented |
MZ0254 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $384 | $1,000 | Implemented |
MZ0254 # 05 Y:2018 | 05 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,499 | $52,000 | Implemented |
MZ0254 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,856 | $10,840 | Implemented |
MZ0254 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,434 | $10,000 | Implemented |
MZ0254 # 02 Y:2018 | 02 | 2018 | USE OPTIMUM THICKNESS INSULATION | $49,702 | $20,960 | Implemented |
MZ0254 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,653 | $180 | Implemented |
UA0193 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,960 | $1,000 | Implemented |
UA0193 # 03 Y:2018 | 03 | 2018 | INSTALL COMMON HEADER ON COMPRESSORS | $63,989 | $119,600 | Not Implemented |
UA0193 # 02 Y:2018 | 02 | 2018 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $62,836 | $165,000 | Not Implemented |
UA0193 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,080 | $25,456 | Not Implemented |
UA0193 # 05 Y:2018 | 05 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,216 | $1,912 | Implemented |
UA0193 # 01 Y:2018 | 01 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $70,570 | $200,000 | Not Implemented |