IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

468

matching recommendations
Reset
NAICS 331523 Nonferrous Metal Die-Casting Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0164 # 02 Y:2021 02 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $9,078 $94,182 Not Implemented
WM0164 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,833 $1,945 Not Implemented
WM0164 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,235 $31,198 Not Implemented
WM0164 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $3,750 Not Implemented
WM0164 # 03 Y:2021 03 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,588 $7,000 Not Implemented
WM0164 # 04 Y:2021 04 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,231 $14,000 Not Implemented
WM0164 # 08 Y:2021 08 2021 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $633 $1,500 Not Implemented
WM0164 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $1,093 $720 Not Implemented
LE0467 # 01 Y:2019 01 2019 INSTALL TIMERS AND/OR THERMOSTATS $825 $70 Implemented
LE0467 # 02 Y:2019 02 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $40,407 $37,000 Not Implemented
LE0467 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,990 $2,000 Implemented
LE0467 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,568 $30,054 Implemented
LE0467 # 06 Y:2019 06 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,352 $35,000 Not Implemented
LE0467 # 05 Y:2019 05 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $14,748 $50,000 Not Implemented
LE0467 # 08 Y:2019 08 2019 UPGRADE OBSOLETE EQUIPMENT $500 $5,000 Implemented
LE0467 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,116 $6,000 Not Implemented
AS0457 # 02 Y:2018 02 2018 USE SOLAR HEAT FOR HEAT $7,441 $1,961 Not Implemented
AS0457 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,791 $19,647 Not Implemented
AS0457 # 04 Y:2018 04 2018 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $4,539 $2,530 Not Implemented
AS0457 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,174 $0 Implemented
AS0457 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,412 $2,750 Not Implemented
AS0457 # 06 Y:2018 06 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,736 $7,600 Not Implemented
AS0457 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,832 $676 Implemented
UD0989 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,291 $1,000 Not Implemented
UD0989 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,012 $0 Not Implemented