IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
Reset
NAICS 331524 Aluminum Foundries (except Die-Casting)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0095 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,134 $5,290 Implemented
MZ0095 # 03 Y:2012 03 2012 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $688 $0 Implemented
MZ0081 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,034 $860 Implemented
MZ0081 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $4,444 $4,000 Implemented
MZ0081 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $9,628 $8,667 Implemented
MZ0081 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $11,110 $9,100 Implemented
MZ0081 # 05 Y:2012 05 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $58,850 $120,000 Implemented
MZ0081 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,137 $1,700 Implemented
MZ0081 # 07 Y:2012 07 2012 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $0 $0 Implemented
BD0381 # 02 Y:2010 02 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $24,197 $70,000 Implemented
BD0381 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,634 $40 Implemented
BD0381 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,137 $2,500 Implemented
BD0381 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $2,065 $1,350 Implemented
BD0381 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,069 $725 Implemented
BD0381 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $812 $2,060 Implemented
BD0381 # 10 Y:2010 10 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $591 $1,900 Implemented
UF0413 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,814 $810 Implemented
UF0413 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,500 $54,000 Implemented
UF0413 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $1,150 $219 Implemented
UF0413 # 05 Y:2008 05 2008 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $14,800 $1,117 Implemented
UF0413 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,321 $13,321 Implemented
UF0413 # 08 Y:2008 08 2008 INSTALL COMMON HEADER ON COMPRESSORS $871 $2,000 Implemented
IA0423 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,458 $617 Implemented
IA0423 # 02 Y:2008 02 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $443 $25 Implemented
IA0423 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $516 $86 Implemented