Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
393
matching recommendationsNAICS | 331524 | Aluminum Foundries (except Die-Casting) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0329 # 03 Y:2003 | 03 | 2003 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $11,417 | $0 | n/a |
UF0329 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,931 | $0 | n/a |
UF0329 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,383 | $370 | n/a |
UF0329 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,754 | $13,170 | n/a |
UF0329 # 07 Y:2003 | 07 | 2003 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $85,198 | $48,000 | n/a |
UF0329 # 08 Y:2003 | 08 | 2003 | RECYCLE CASTING SAND | $836,208 | $1,130,370 | n/a |
UF0329 # 09 Y:2003 | 09 | 2003 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $708,707 | $335,000 | n/a |
UF0329 # 10 Y:2003 | 10 | 2003 | ADOPT IN-HOUSE MATERIAL GENERATION | $141,821 | $165,600 | n/a |
UF0329 # 11 Y:2003 | 11 | 2003 | IMPROVE SPACE COMFORT CONDITIONING | $1,192 | $2,675 | n/a |
WV0266 # 12 Y:2003 | 12 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,000 | $2,550 | Implemented |
WV0266 # 13 Y:2003 | 13 | 2003 | INSTALL SPECTRAL REFLECTORS / DELAMP | $994 | $1,240 | Not Implemented |
WV0266 # 14 Y:2003 | 14 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $39,573 | $0 | Implemented |
WV0266 # 15 Y:2003 | 15 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,178 | $80 | Not Implemented |
WV0266 # 11 Y:2003 | 11 | 2003 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $142,002 | $980,000 | Not Implemented |
WV0266 # 10 Y:2003 | 10 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,326 | $0 | Implemented |
WV0266 # 09 Y:2003 | 09 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,520 | $150 | Implemented |
WV0266 # 08 Y:2003 | 08 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,937 | $79 | Implemented |
WV0266 # 07 Y:2003 | 07 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,479 | $6,285 | Not Implemented |
WV0266 # 06 Y:2003 | 06 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,057 | $0 | Not Implemented |
WV0266 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,398 | $735 | Not Implemented |
WV0266 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $9,430 | $625 | Implemented |
WV0266 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,846 | $250 | Implemented |
WV0266 # 02 Y:2003 | 02 | 2003 | INSULATE BARE EQUIPMENT | $22,125 | $1,423 | Implemented |
WV0266 # 01 Y:2003 | 01 | 2003 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $14,242 | $10,500 | Not Implemented |
SU0160 # 01 Y:2003 | 01 | 2003 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $446,941 | $142,000 | Not Implemented |