IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

393

matching recommendations
Reset
NAICS 331524 Aluminum Foundries (except Die-Casting)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0319 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,762 $4,140 Implemented
MZ0319 # 03 Y:2021 03 2021 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $3,002 $600 Implemented
MZ0319 # 02 Y:2021 02 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,278 $240 Implemented
MZ0319 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $687 $800 Implemented
MZ0281 # 04 Y:2020 04 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,486 $720 Not Implemented
MZ0281 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $98 $250 Not Implemented
MZ0281 # 02 Y:2020 02 2020 INSTALL SPECTRAL REFLECTORS / DELAMP $1,877 $396 Not Implemented
MZ0281 # 01 Y:2020 01 2020 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $22,302 $48,220 Not Implemented
MA0799 # 06 Y:2019 06 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,202 $5,200 Not Implemented
MA0799 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,784 $4,000 Implemented
MA0799 # 04 Y:2019 04 2019 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,709 $2,500 Implemented
MA0799 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,442 $14,461 Implemented
MA0799 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,826 $47,870 Not Implemented
MA0799 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,506 $138,640 Not Implemented
UA0193 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,080 $25,456 Not Implemented
UA0193 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $6,216 $1,912 Implemented
UA0193 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,960 $1,000 Implemented
UA0193 # 03 Y:2018 03 2018 INSTALL COMMON HEADER ON COMPRESSORS $63,989 $119,600 Not Implemented
UA0193 # 02 Y:2018 02 2018 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $62,836 $165,000 Not Implemented
UA0193 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $70,570 $200,000 Not Implemented
IP0096 # 07 Y:2018 07 2018 UPGRADE CONTROLS ON COMPRESSORS $13,560 $30,000 Not Implemented
IP0096 # 12 Y:2018 12 2018 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $180,631 $300,000 Not Implemented
IP0096 # 11 Y:2018 11 2018 ADD AREA LIGHTING SWITCHES $1,738 $130 Implemented
IP0096 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,834 $68,658 Implemented
IP0096 # 09 Y:2018 09 2018 USE OPTIMUM THICKNESS INSULATION $18,548 $984 Implemented