Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
366
matching recommendationsNAICS | 331524 | Aluminum Foundries (except Die-Casting) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0096 # 12 Y:2018 | 12 | 2018 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $180,631 | $300,000 | Not Implemented |
UD0979 # 09 Y:2018 | 09 | 2018 | USE OPTIMUM THICKNESS INSULATION | $18,548 | $984 | Implemented |
UD0979 # 10 Y:2018 | 10 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,834 | $68,160 | Implemented |
UD0979 # 11 Y:2018 | 11 | 2018 | ADD AREA LIGHTING SWITCHES | $1,666 | $130 | Implemented |
UD0979 # 12 Y:2018 | 12 | 2018 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $180,631 | $300,000 | Not Implemented |
IP0096 # 11 Y:2018 | 11 | 2018 | ADD AREA LIGHTING SWITCHES | $1,738 | $130 | Implemented |
IP0096 # 10 Y:2018 | 10 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,834 | $68,658 | Implemented |
IP0096 # 09 Y:2018 | 09 | 2018 | USE OPTIMUM THICKNESS INSULATION | $18,548 | $984 | Implemented |
IP0096 # 08 Y:2018 | 08 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,917 | $12,782 | Implemented |
UD0979 # 01 Y:2018 | 01 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,640 | $0 | Implemented |
IP0096 # 07 Y:2018 | 07 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $13,560 | $30,000 | Not Implemented |
IP0096 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,206 | $905 | Implemented |
IP0096 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $31,331 | $6 | Implemented |
IP0096 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,979 | $2,680 | Implemented |
IP0096 # 03 Y:2018 | 03 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $26,438 | $4,500 | Not Implemented |
IP0096 # 02 Y:2018 | 02 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,096 | $0 | Not Implemented |
IP0096 # 01 Y:2018 | 01 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,640 | $0 | Implemented |
UF0508 # 09 Y:2017 | 09 | 2017 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,871 | $700 | Implemented |
UF0508 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $1,548 | $478 | Implemented |
UF0508 # 07 Y:2017 | 07 | 2017 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $3,384 | $640 | Implemented |
UF0508 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,564 | $0 | Implemented |
UF0508 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,144 | $1,169 | Implemented |
UF0508 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,193 | $2,737 | Implemented |
UF0508 # 03 Y:2017 | 03 | 2017 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,931 | $12,400 | Implemented |
UF0508 # 02 Y:2017 | 02 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,114 | $20,000 | Implemented |