Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,802
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0043 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,674 | $31,572 | n/a |
NT0043 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $17,336 | $25,437 | n/a |
NT0043 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $146,777 | $515,060 | n/a |
NT0043 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,389 | $0 | n/a |
NT0043 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,473 | $5,609 | n/a |
OK1137 # 08 Y:2025 | 08 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $558 | $410 | n/a |
OK1137 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,886 | $1,320 | n/a |
OK1137 # 09 Y:2025 | 09 | 2025 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,109 | $2,120 | n/a |
OK1137 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,249 | $160,056 | n/a |
OK1137 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $520 | $1,286 | n/a |
OK1137 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,482 | $12,000 | n/a |
OK1137 # 10 Y:2025 | 10 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,857 | $3,900 | n/a |
OK1137 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $641 | $985 | n/a |
OK1137 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,920 | $6,940 | n/a |
OK1137 # 07 Y:2025 | 07 | 2025 | COMBINE UTILITY METERS | $682 | $80 | n/a |
IC0325 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $2,149 | $5,256 | n/a |
IC0325 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,138 | $5,309 | n/a |
IC0325 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,318 | $7,240 | n/a |
IC0325 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,350 | $246 | n/a |
IC0325 # 10 Y:2025 | 10 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,175 | $2,940 | n/a |
IC0325 # 05 Y:2025 | 05 | 2025 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $4,795 | $3,414 | n/a |
IC0325 # 02 Y:2025 | 02 | 2025 | INSTALL EFFICIENT RECTIFIERS | $8,079 | $8,129 | n/a |
IC0325 # 08 Y:2025 | 08 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,716 | $0 | n/a |
IC0325 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $34,094 | $58,119 | n/a |
IC0325 # 09 Y:2025 | 09 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,137 | $0 | n/a |