Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,910
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0213 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,494 | $0 | n/a |
IP0213 # 10 Y:2025 | 10 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,498 | $13,433 | n/a |
IP0213 # 08 Y:2025 | 08 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $48,428 | $56,200 | n/a |
IP0213 # 06 Y:2025 | 06 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $9,346 | $3,710 | n/a |
IP0213 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,943 | $4,528 | n/a |
IP0213 # 07 Y:2025 | 07 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $825 | $340 | n/a |
IP0213 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,374 | $270 | n/a |
IP0213 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,623 | $640 | n/a |
IP0213 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,151 | $26,250 | n/a |
IP0213 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $953 | $280 | n/a |
IC0327 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,206 | $226 | n/a |
IP0212 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $914 | $593 | n/a |
IC0327 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $1,870 | $5,460 | n/a |
IC0327 # 09 Y:2025 | 09 | 2025 | INSULATE BARE EQUIPMENT | $1,978 | $756 | n/a |
IP0212 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $35,687 | $360 | n/a |
IP0212 # 01 Y:2025 | 01 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,010 | $0 | n/a |
IC0327 # 06 Y:2025 | 06 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $5,105 | $1,367 | n/a |
IC0327 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,276 | $0 | n/a |
IC0327 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,732 | $1,026 | n/a |
IC0327 # 08 Y:2025 | 08 | 2025 | OPTIMIZE PLANT POWER FACTOR | $77,211 | $108,749 | n/a |
IP0212 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $29,292 | $84,000 | n/a |
IC0327 # 02 Y:2025 | 02 | 2025 | ADJUST BURNERS FOR EFFICIENT OPERATION | $11,584 | $631 | n/a |
IP0212 # 05 Y:2025 | 05 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $9,826 | $39,500 | n/a |
IC0327 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $696 | $288 | n/a |
MS0449 # 04 Y:2025 | 04 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $11,235 | $15,450 | n/a |