IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,503

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0918 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $537 $1,000 Implemented
WM0060 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,761 $2,291 Implemented
WM0060 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,355 $0 Implemented
WM0060 # 04 Y:2015 04 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $3,701 $1,218 Implemented
WM0060 # 05 Y:2015 05 2015 REPAIR AND ELIMINATE STEAM LEAKS $1,080 $110 Implemented
WM0060 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $786 $3,000 Implemented
WM0060 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $680 $255 Implemented
MA0738 # 01 Y:2015 01 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $59,139 $500 Implemented
MA0738 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,551 $1,000 Implemented
MA0738 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $347 $400 Implemented
MZ0164 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $188,887 $0 Implemented
MZ0164 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $71,454 $0 Implemented
MZ0164 # 04 Y:2014 04 2014 UPGRADE CONTROLS ON COMPRESSORS $24,203 $100,000 Implemented
MZ0164 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,593 $6,500 Implemented
MZ0164 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,200 $1,430 Implemented
MZ0164 # 07 Y:2014 07 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $47,302 $25,000 Implemented
MZ0164 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $56,600 $384,000 Implemented
AM0670 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,260 $10,630 Implemented
AM0670 # 02 Y:2014 02 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,160 $1,190 Implemented
AM0670 # 04 Y:2014 04 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,850 $660 Implemented
AM0670 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $830 $8 Implemented
AM0670 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $645 $355 Implemented
AM0670 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $810 Implemented
AM0670 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $200 Implemented
AM0669 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,407 $52 Implemented