Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,503
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0086 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,500 | $4,000 | Implemented |
MA0691 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $772 | $1,575 | Implemented |
MA0691 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $249 | $200 | Implemented |
MAS023 # 01 Y:2012 | 01 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,820 | $44,000 | Implemented |
MAS023 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,502 | $7,500 | Implemented |
MAS023 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,970 | $8,500 | Implemented |
MAS023 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,899 | $9,580 | Implemented |
MAS023 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $596 | $0 | Implemented |
CO0656 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,170 | $630 | Implemented |
CO0656 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,770 | $53,300 | Implemented |
CO0656 # 04 Y:2012 | 04 | 2012 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $7,530 | $4,000 | Implemented |
CO0656 # 05 Y:2012 | 05 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,280 | $260 | Implemented |
MAS022 # 01 Y:2012 | 01 | 2012 | INSULATE BARE EQUIPMENT | $19,167 | $20,900 | Implemented |
MAS022 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,821 | $2,600 | Implemented |
MAS022 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,186 | $4,660 | Implemented |
MAS022 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $875 | $0 | Implemented |
MI0219 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,003 | $37,014 | Implemented |
MI0219 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,275 | $1,660 | Implemented |
MI0219 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,535 | $1,800 | Implemented |
MI0219 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,739 | $6,080 | Implemented |
MI0219 # 07 Y:2012 | 07 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $895 | $2,320 | Implemented |
MI0219 # 08 Y:2012 | 08 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $734 | $120 | Implemented |
UMS006 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $28,000 | $10,000 | Implemented |
DL0084 # 01 Y:2012 | 01 | 2012 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,825 | $500 | Implemented |
AM0605 # 01 Y:2012 | 01 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $18,020 | $300 | Implemented |