Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
174
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0430 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,813 | $470 | Implemented |
MI0430 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,292 | $1,980 | Implemented |
MI0430 # 05 Y:2023 | 05 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,834 | $7,288 | Implemented |
MI0430 # 01 Y:2023 | 01 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $25,630 | $580 | Implemented |
UF0587 # 07 Y:2022 | 07 | 2022 | IMPROVE SPACE COMFORT CONDITIONING | $15,247 | $4,480 | Implemented |
UF0587 # 08 Y:2022 | 08 | 2022 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $5,274 | $0 | Implemented |
UF0587 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,086 | $356 | Implemented |
MI0402 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,050 | $1,980 | Implemented |
MI0402 # 07 Y:2022 | 07 | 2022 | USE COMPRESSOR AIR FILTERS | $934 | $580 | Implemented |
MI0402 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,039 | $5,244 | Implemented |
MI0402 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,047 | $2,100 | Implemented |
MI0401 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,273 | $1,930 | Implemented |
MI0401 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,026 | $580 | Implemented |
MI0401 # 03 Y:2022 | 03 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,485 | $25,433 | Implemented |
MI0399 # 03 Y:2021 | 03 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,020 | $320 | Implemented |
MI0399 # 04 Y:2021 | 04 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $15,245 | $70,400 | Implemented |
MI0399 # 07 Y:2021 | 07 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,286 | $4,468 | Implemented |
MI0399 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,405 | $1,670 | Implemented |
MI0399 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $54,060 | $240,000 | Implemented |
MI0387 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,993 | $4,308 | Implemented |
MI0387 # 06 Y:2021 | 06 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,824 | $120 | Implemented |
MI0387 # 01 Y:2021 | 01 | 2021 | AIR CONDITION ONLY SPACE NECESSARY | $12,419 | $16,940 | Implemented |
MI0387 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,595 | $1,980 | Implemented |
MI0387 # 09 Y:2021 | 09 | 2021 | INSTALL OCCUPANCY SENSORS | $1,412 | $780 | Implemented |
MI0387 # 10 Y:2021 | 10 | 2021 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,403 | $4,900 | Implemented |