IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

314

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0772 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,160 $0 Implemented
OK0772 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,094 $353 Not Implemented
OK0772 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,498 $2,767 Not Implemented
OK0772 # 05 Y:2009 05 2009 OPERATE BOILERS ON HIGH FIRE SETTING $4,261 $17,500 Implemented
OK0772 # 06 Y:2009 06 2009 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $400 $0 Not Implemented
OK0772 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,532 $2,954 Implemented
OK0772 # 08 Y:2009 08 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $4,295 $953 Not Implemented
OK0761 # 01 Y:2008 01 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,213 $0 Implemented
OK0761 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $14,263 $4,638 Implemented
OK0761 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $525 $2,871 Implemented
OK0761 # 04 Y:2008 04 2008 INSTALL SET-BACK TIMERS $3,105 $1,908 Implemented
OK0761 # 05 Y:2008 05 2008 $5,200 $0 Implemented
OK0758 # 01 Y:2008 01 2008 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,272 $20,990 Not Implemented
OK0758 # 02 Y:2008 02 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,470 $6,841 Not Implemented
OK0758 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,699 $51,819 Implemented
OK0758 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $215 $1,762 Not Implemented
OK0758 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,290 $1,000 Implemented
OK0758 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $144 $754 Not Implemented
OK0758 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,316 $600 Implemented
OK0744 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,427 $8,720 Not Implemented
OK0744 # 02 Y:2007 02 2007 USE RADIANT HEATER FOR SPOT HEATING $34,603 $3,729 Not Implemented
OK0744 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,080 $360 Not Implemented
OK0744 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,247 $2,398 Not Implemented
OK0744 # 05 Y:2007 05 2007 $800 $0 Not Implemented
OK0728 # 01 Y:2006 01 2006 REDUCE VENTILATION AIR $35,971 $12,184 Not Implemented