IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

481

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0057 # 09 Y:2016 09 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $927 $200 Implemented
IP0057 # 10 Y:2016 10 2016 $747 $260 Implemented
IP0057 # 11 Y:2016 11 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $788 $1,027 Not Implemented
IP0057 # 12 Y:2016 12 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,971 $8,516 Not Implemented
IP0057 # 13 Y:2016 13 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $440 Implemented
IP0057 # 14 Y:2016 14 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,183 $7,207 Not Implemented
IP0057 # 15 Y:2016 15 2016 RECOVER WASTE HEAT FROM EQUIPMENT $464 $1,038 Not Implemented
IP0057 # 16 Y:2016 16 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $190 $664 Implemented
IP0057 # 17 Y:2016 17 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $8,619 $30,789 Not Implemented
IP0057 # 18 Y:2016 18 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $534 $2,607 Implemented
IP0052 # 01 Y:2015 01 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,077 $47 Implemented
IP0052 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $437 $9 Implemented
IP0052 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,655 $61 Implemented
IP0052 # 04 Y:2015 04 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $12,878 $902 Implemented
IP0052 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $6,052 $2,650 Not Implemented
IP0052 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,932 $953 Not Implemented
IP0052 # 07 Y:2015 07 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $10,505 $7,153 Implemented
IP0052 # 08 Y:2015 08 2015 APPLY FOR INVESTMENT INCENTIVES $12,926 $10,000 Implemented
IP0052 # 09 Y:2015 09 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,874 $4,725 Not Implemented
IP0052 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $50 $179 Not Implemented
IP0029 # 01 Y:2014 01 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,363 $210 Not Implemented
IP0029 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,383 $92 Not Implemented
IP0029 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $980 $122 Not Implemented
IP0029 # 04 Y:2014 04 2014 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $82,707 $12,435 Not Implemented
IP0029 # 05 Y:2014 05 2014 INSULATE BARE EQUIPMENT $2,997 $1,104 Not Implemented