IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

448

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0876 # 11 Y:2013 11 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $489 $50 Not Implemented
UD0876 # 12 Y:2013 12 2013 USE RADIANT HEATER FOR SPOT HEATING $10,039 $15,000 Implemented
UD0876 # 13 Y:2013 13 2013 AIR CONDITION ONLY SPACE NECESSARY $1,344 $0 Implemented
NC0483 # 01 Y:2013 01 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $240,743 $750,000 Not Implemented
NC0483 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,552 $69,000 Not Implemented
NC0483 # 03 Y:2013 03 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,715 $20,000 Not Implemented
NC0483 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80,247 $134,713 Implemented
NC0483 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,537 $18,520 Implemented
NC0483 # 06 Y:2013 06 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $791 $50 Implemented
OK0844 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,922 $21,000 Implemented
OK0844 # 02 Y:2013 02 2013 OPTIMIZE PLANT POWER FACTOR $6,000 $32,130 Not Implemented
OK0844 # 03 Y:2013 03 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,299 $76,750 Implemented
OK0844 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,154 $4,200 Implemented
OK0844 # 05 Y:2013 05 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,800 $18,500 Not Implemented
BS0013 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,038 $5,639 Implemented
BS0013 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,210 $20 Implemented
BS0013 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $199 $250 Not Implemented
BS0013 # 04 Y:2013 04 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,825 $22,200 Not Implemented
BS0013 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $312 $77 Implemented
BS0013 # 06 Y:2013 06 2013 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,270 $360 Not Implemented
WM0021 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $483 $184 Not Implemented
WM0021 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $456 $0 Not Implemented
WM0021 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $263 $225 Not Implemented
WM0021 # 04 Y:2013 04 2013 REDUCE DELIVERY SCHEDULES $732 $0 Not Implemented
WM0021 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $234 $47 Not Implemented