Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
948
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0845 # 03 Y:2011 | 03 | 2011 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,285 | $4,000 | Implemented |
UD0845 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $286 | $1,500 | Not Implemented |
UD0845 # 05 Y:2011 | 05 | 2011 | REDUCE HEAT GAIN BY WINDOW TINTING | $533 | $0 | Not Implemented |
WV0431 # 01 Y:2011 | 01 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $135,254 | $682,000 | Implemented |
WV0431 # 02 Y:2011 | 02 | 2011 | USE OPTIMUM THICKNESS INSULATION | $29,707 | $75,000 | Not Implemented |
WV0431 # 03 Y:2011 | 03 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,355 | $11,500 | Not Implemented |
WV0431 # 04 Y:2011 | 04 | 2011 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,105 | $1,850 | Implemented |
WV0431 # 05 Y:2011 | 05 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $6,207 | $1,076 | Implemented |
WV0431 # 06 Y:2011 | 06 | 2011 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,020 | $0 | Not Implemented |
WV0431 # 07 Y:2011 | 07 | 2011 | INSTALL OCCUPANCY SENSORS | $2,808 | $408 | Implemented |
WV0431 # 08 Y:2011 | 08 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,027 | $1,560 | Implemented |
WV0423 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,866 | $52,636 | Not Implemented |
WV0423 # 02 Y:2011 | 02 | 2011 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,406 | $12,655 | Not Implemented |
WV0423 # 03 Y:2011 | 03 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $1,913 | $1,429 | Not Implemented |
WV0423 # 04 Y:2011 | 04 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $1,472 | $626 | Implemented |
WV0423 # 05 Y:2011 | 05 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $1,173 | $2,443 | Implemented |
WV0423 # 06 Y:2011 | 06 | 2011 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $1,041 | $1,000 | Implemented |
WV0423 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $521 | $89 | Implemented |
WV0423 # 08 Y:2011 | 08 | 2011 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $428 | $183 | Implemented |
WV0423 # 09 Y:2011 | 09 | 2011 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $343 | $177 | Implemented |
WV0423 # 10 Y:2011 | 10 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $296 | $1,148 | Not Implemented |
WV0423 # 11 Y:2011 | 11 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $278 | $267 | Not Implemented |
WV0423 # 12 Y:2011 | 12 | 2011 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $272 | $139 | Implemented |
WV0423 # 13 Y:2011 | 13 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $216 | $200 | Not Implemented |
UD0831 # 01 Y:2011 | 01 | 2011 | USE SOLAR HEAT TO MAKE ELECTRICTY | $28,448 | $196,170 | Not Implemented |