IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0486 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,397 $51,976 Implemented
WV0486 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,550 $688 Implemented
WV0486 # 04 Y:2014 04 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,358 $1,000 Implemented
WV0486 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $846 $3,700 Not Implemented
WV0486 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $558 $75 Implemented
WV0486 # 07 Y:2014 07 2014 DEVELOP A REPAIR/REPLACE POLICY $262 $519 Implemented
LE0381 # 01 Y:2014 01 2014 INSTALL TIMERS AND/OR THERMOSTATS $1,880 $36 Implemented
LE0381 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,361 $838 Not Implemented
LE0381 # 03 Y:2014 03 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $19,935 $4,735 Not Implemented
LE0381 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $95,368 $34,500 Not Implemented
LE0381 # 05 Y:2014 05 2014 REPAIR AND ELIMINATE STEAM LEAKS $3,233 $771 Implemented
LE0381 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,665 $3,500 Implemented
LE0381 # 07 Y:2014 07 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,549 $5,000 Not Implemented
LE0381 # 08 Y:2014 08 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $105,416 $79,682 Not Implemented
LE0381 # 09 Y:2014 09 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,210 $3,000 Not Implemented
LE0381 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $6,567 $9,190 Implemented
LE0381 # 11 Y:2014 11 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,146 $3,000 Not Implemented
LE0381 # 12 Y:2014 12 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,362 $16,000 Not Implemented
LE0381 # 13 Y:2014 13 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,644 $10,950 Not Implemented
LE0381 # 14 Y:2014 14 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,535 $51,625 Not Implemented
UM0444 # 01 Y:2014 01 2014 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $216,000 $500,000 Not Implemented
UM0444 # 02 Y:2014 02 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $71,820 $133,000 Not Implemented
UM0444 # 03 Y:2014 03 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $67,306 $80,000 Not Implemented
UM0444 # 04 Y:2014 04 2014 USE MINIMUM STEAM OPERATING PRESSURE $6,638 $5,000 Implemented
UM0444 # 05 Y:2014 05 2014 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $104,300 $208,000 Not Implemented