IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0441 # 01 Y:2014 01 2014 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $73,169 $180,000 Not Implemented
UM0441 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,700 $14,400 Not Implemented
UM0441 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,664 $2,500 Implemented
UM0441 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,450 $3,480 Implemented
SF0444 # 01 Y:2014 01 2014 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $9,479 $8,763 Not Implemented
SF0444 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,108 $4,124 Not Implemented
SF0444 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,895 $22,758 Not Implemented
SF0444 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $1,967 Implemented
SF0444 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,642 $40,100 Not Implemented
OK0874 # 01 Y:2014 01 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $380 $112 Implemented
OK0874 # 02 Y:2014 02 2014 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $3,364 $1,568 Implemented
OK0874 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,682 $0 Implemented
OK0874 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,847 $980 Implemented
OK0874 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,899 $21,005 Not Implemented
OK0874 # 06 Y:2014 06 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $934 $1,024 Implemented
WV0480 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,022 $11,662 Implemented
WV0480 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,078 $11,520 Not Implemented
WV0480 # 03 Y:2014 03 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,929 $2,475 Not Implemented
WV0480 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,140 $2,788 Not Implemented
WV0480 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,543 $3,291 Implemented
WV0480 # 06 Y:2014 06 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,967 $1,000 Implemented
WV0480 # 07 Y:2014 07 2014 OPTIMIZE PLANT POWER FACTOR $2,869 $13,803 Not Implemented
WV0480 # 08 Y:2014 08 2014 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,520 $894 Not Implemented
WV0480 # 09 Y:2014 09 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,181 $2,188 Not Implemented
WV0480 # 10 Y:2014 10 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,088 $500 Implemented