Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
948
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0826 # 03 Y:2010 | 03 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $978 | $60 | Implemented |
UD0826 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,213 | $35,000 | Implemented |
UD0826 # 05 Y:2010 | 05 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $788 | $2,200 | Implemented |
UD0826 # 06 Y:2010 | 06 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $337 | $1,750 | Not Implemented |
UD0826 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $51,028 | $24,300 | Not Implemented |
UD0826 # 08 Y:2010 | 08 | 2010 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,244 | $2,000 | Not Implemented |
UD0826 # 09 Y:2010 | 09 | 2010 | INSULATE BARE EQUIPMENT | $5,734 | $1,600 | Implemented |
UD0826 # 10 Y:2010 | 10 | 2010 | INSULATE BARE EQUIPMENT | $3,846 | $23,040 | Not Implemented |
WV0411 # 01 Y:2010 | 01 | 2010 | REDESIGN PROCESS | $11,522 | $20,345 | Not Implemented |
WV0411 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,172 | $6,123 | Implemented |
WV0411 # 03 Y:2010 | 03 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,958 | $3,705 | Implemented |
WV0411 # 04 Y:2010 | 04 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $2,081 | $3,392 | Not Implemented |
UD0823 # 01 Y:2010 | 01 | 2010 | COMBINE UTILITY METERS | $6,391 | $200 | Not Implemented |
UD0823 # 02 Y:2010 | 02 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,915 | $25 | Not Implemented |
UD0823 # 03 Y:2010 | 03 | 2010 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $253 | $25 | Not Implemented |
UD0823 # 04 Y:2010 | 04 | 2010 | INSTALL WIND POWERED ELECTRIC GENERATOR | $1,820,272 | $1,400,000 | Not Implemented |
UD0823 # 05 Y:2010 | 05 | 2010 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,291 | $98,085 | Not Implemented |
UD0823 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $17,201 | $7,375 | Implemented |
UD0823 # 07 Y:2010 | 07 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $21,736 | $125 | Not Implemented |
UD0823 # 08 Y:2010 | 08 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,268 | $25 | Implemented |
UD0823 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $580 | $500 | Not Implemented |
UD0823 # 10 Y:2010 | 10 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $524 | $25 | Implemented |
UD0823 # 11 Y:2010 | 11 | 2010 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $19,629 | $7,500 | Not Implemented |
UD0823 # 12 Y:2010 | 12 | 2010 | USE OPTIMUM TEMPERATURE | $3,244 | $63 | Not Implemented |
UD0823 # 13 Y:2010 | 13 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,010 | $50,050 | Implemented |