IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0677 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,225 $200 Implemented
MA0677 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $912 $8,300 Not Implemented
MA0677 # 06 Y:2011 06 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $362 $500 Implemented
MA0677 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $107 $100 Implemented
SD0440 # 01 Y:2011 01 2011 ADD AREA LIGHTING SWITCHES $157 $100 Not Implemented
SD0440 # 02 Y:2011 02 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,314 $1,156 Not Implemented
SD0440 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,205 $24,995 Not Implemented
SD0440 # 04 Y:2011 04 2011 INSTALL SKYLIGHTS $8,840 $24,421 Not Implemented
SD0440 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,302 $3,800 Not Implemented
WV0437 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,791 $69,419 Implemented
WV0437 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,832 $363 Implemented
WV0437 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,170 $5,180 Not Implemented
WV0437 # 04 Y:2011 04 2011 UPGRADE CONTROLS ON COMPRESSORS $3,937 $18,000 Not Implemented
WV0437 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $2,985 $613 Implemented
WV0437 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,934 $5,194 Implemented
WV0437 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,803 $1,613 Implemented
WV0437 # 08 Y:2011 08 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,837 $1,119 Implemented
WV0437 # 09 Y:2011 09 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,451 $4,200 Not Implemented
OK0814 # 01 Y:2011 01 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $262,832 $1,710,000 Implemented
OK0814 # 02 Y:2011 02 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $189,220 $20,000 Implemented
OK0814 # 03 Y:2011 03 2011 INSTALL EQUIPMENT TO MOVE PRODUCT $1,364,602 $235,960 Implemented
OK0814 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,049 $15,319 Implemented
OK0814 # 05 Y:2011 05 2011 ADJUST BURNERS FOR EFFICIENT OPERATION $23,113 $11,400 Not Implemented
IA0466 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,117 $500 Implemented
IA0466 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $159 $310 Implemented