IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

648

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0048 # 07 Y:2015 07 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $965 $175 Implemented
BS0048 # 08 Y:2015 08 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $168 $805 Implemented
BS0048 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $406 $722 Implemented
BS0048 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $305 $20 Not Implemented
UM0453 # 01 Y:2015 01 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,380 $5,000 Not Implemented
UM0453 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,831 $1,000 Implemented
UM0453 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,442 $1,500 Implemented
UM0453 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,115 $5,400 Not Implemented
UM0453 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $7,852 $4,000 Implemented
LE0389 # 01 Y:2015 01 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,935 $450 Implemented
LE0389 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,547 $4,500 Implemented
LE0389 # 03 Y:2015 03 2015 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $21,418 $21,650 Implemented
LE0389 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $642 $1,000 Implemented
LE0389 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,458 $81,373 Implemented
LE0389 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,484 $20,000 Not Implemented
WM0061 # 01 Y:2015 01 2015 INSULATE BARE EQUIPMENT $6,292 $3,164 Not Implemented
WM0061 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $400 $518 Not Implemented
WM0061 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,854 $51,600 Not Implemented
WM0061 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,688 $5,526 Implemented
WM0061 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,426 $1,849 Implemented
WM0061 # 06 Y:2015 06 2015 USE SYNTHETIC LUBRICANT $2,017 $1,155 Implemented
WM0061 # 07 Y:2015 07 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $721 $2,000 Not Implemented
WM0061 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,308 $23,529 Not Implemented
WM0061 # 09 Y:2015 09 2015 USE MAGNETIC TECHNOLOGY TO TREAT WATER $1,996 $4,600 Not Implemented
WM0061 # 10 Y:2015 10 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $658 $750 Not Implemented