Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
11,113
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0023 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $848 | $2,144 | Not Implemented |
SJ0023 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $1,478 | $305 | Not Implemented |
SJ0023 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,823 | $2,466 | Not Implemented |
SJ0023 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,164 | $1,874 | Not Implemented |
SJ0023 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,625 | $0 | Not Implemented |
SJ0023 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $190 | $380 | Not Implemented |
WV0666 # 01 Y:2024 | 01 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $11,346 | $19,500 | Not Implemented |
WV0666 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,679 | $5,920 | Not Implemented |
WV0666 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $859 | $3,565 | Implemented |
WV0666 # 04 Y:2024 | 04 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $445 | $1,367 | Implemented |
WV0666 # 05 Y:2024 | 05 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $260 | $640 | Implemented |
WV0666 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $84 | $100 | Implemented |
AM0927 # 01 Y:2024 | 01 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $86,006 | $120,000 | n/a |
AM0927 # 02 Y:2024 | 02 | 2024 | REDESIGN PROCESS | $7,085 | $34,585 | n/a |
AM0927 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $5,300 | $8,620 | n/a |
AM0927 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $841 | $166 | n/a |
AM0927 # 05 Y:2024 | 05 | 2024 | USE SYNTHETIC LUBRICANT | $295 | $166 | n/a |
MS0432 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $399 | $4,320 | n/a |
MS0432 # 02 Y:2024 | 02 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,546 | $29,394 | n/a |
MS0432 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,097 | $340,025 | n/a |
NL0096 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $58,179 | $80,000 | Implemented |
NL0096 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $45,060 | $54,620 | Not Implemented |
NL0096 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,407 | $21,500 | Implemented |
NL0096 # 04 Y:2024 | 04 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $37,143 | $3,000 | Implemented |
NL0096 # 05 Y:2024 | 05 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $20,701 | $600 | Not Implemented |