IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

11,113

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0023 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $848 $2,144 Not Implemented
SJ0023 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $1,478 $305 Not Implemented
SJ0023 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,823 $2,466 Not Implemented
SJ0023 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,164 $1,874 Not Implemented
SJ0023 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,625 $0 Not Implemented
SJ0023 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $190 $380 Not Implemented
WV0666 # 01 Y:2024 01 2024 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,346 $19,500 Not Implemented
WV0666 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,679 $5,920 Not Implemented
WV0666 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $859 $3,565 Implemented
WV0666 # 04 Y:2024 04 2024 DEVELOP A REPAIR/REPLACE POLICY $445 $1,367 Implemented
WV0666 # 05 Y:2024 05 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $260 $640 Implemented
WV0666 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $84 $100 Implemented
AM0927 # 01 Y:2024 01 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $86,006 $120,000 n/a
AM0927 # 02 Y:2024 02 2024 REDESIGN PROCESS $7,085 $34,585 n/a
AM0927 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $5,300 $8,620 n/a
AM0927 # 04 Y:2024 04 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $841 $166 n/a
AM0927 # 05 Y:2024 05 2024 USE SYNTHETIC LUBRICANT $295 $166 n/a
MS0432 # 01 Y:2024 01 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $399 $4,320 n/a
MS0432 # 02 Y:2024 02 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,546 $29,394 n/a
MS0432 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $57,097 $340,025 n/a
NL0096 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $58,179 $80,000 Implemented
NL0096 # 02 Y:2024 02 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $45,060 $54,620 Not Implemented
NL0096 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,407 $21,500 Implemented
NL0096 # 04 Y:2024 04 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $37,143 $3,000 Implemented
NL0096 # 05 Y:2024 05 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $20,701 $600 Not Implemented