IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,517

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0375 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,903 $13,350 Implemented
SD0375 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,954 $7,595 Not Implemented
SD0375 # 03 Y:2006 03 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,356 $14,145 Not Implemented
SD0375 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,793 $3,000 Implemented
SD0375 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $6,983 $537 Not Implemented
SD0375 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $2,079 $3,500 Not Implemented
SD0375 # 07 Y:2006 07 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,700 $18,500 Not Implemented
SD0375 # 08 Y:2006 08 2006 INSTALL EQUIPMENT TO MOVE PRODUCT $77,126 $70,000 Not Implemented
MA0591 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,080 $82,975 Not Implemented
MA0591 # 02 Y:2006 02 2006 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $20,245 $77,830 Not Implemented
MA0591 # 03 Y:2006 03 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,565 $37,830 Implemented
MA0591 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,411 $1,650 Implemented
MA0591 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $5,675 $1,820 Implemented
MA0591 # 06 Y:2006 06 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,143 $12,500 Implemented
MA0591 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $2,354 $5,390 Implemented
MA0591 # 08 Y:2006 08 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,780 $5,264 Implemented
MA0591 # 09 Y:2006 09 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,152 $260 Not Implemented
SU0228 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,378 $0 Implemented
SU0228 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $31,676 $40,711 Implemented
SU0228 # 03 Y:2006 03 2006 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $39,585 $111,774 Implemented
SU0228 # 04 Y:2006 04 2006 INCREASE USE OF AUTOMATION $1,765,875 $3,500,000 Implemented
MS0287 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,298 $78,252 Not Implemented
MS0287 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $17,250 $41 Not Implemented
MS0287 # 03 Y:2006 03 2006 CONDENSE OPERATION INTO ONE BUILDING $9,134 $100 Not Implemented
MS0287 # 04 Y:2006 04 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,563 $4,617 Not Implemented