Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,517
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0287 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,562 | $16,090 | Not Implemented |
MS0287 # 06 Y:2006 | 06 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,494 | $3,825 | Not Implemented |
MS0287 # 07 Y:2006 | 07 | 2006 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,437 | $1,550 | Not Implemented |
MS0287 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,052 | $213 | Not Implemented |
MS0287 # 09 Y:2006 | 09 | 2006 | AIR CONDITION ONLY SPACE NECESSARY | $538 | $400 | Not Implemented |
UF0372 # 01 Y:2005 | 01 | 2005 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $22,802 | $2,143 | Implemented |
UF0372 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,373 | $10,886 | Implemented |
UF0372 # 03 Y:2005 | 03 | 2005 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,383 | $0 | Implemented |
UF0372 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $3,070 | $1,427 | Not Implemented |
UF0372 # 05 Y:2005 | 05 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,158 | $28,067 | Not Implemented |
UF0372 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $55,681 | $32,374 | Not Implemented |
UF0372 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,223 | $16,223 | Implemented |
UF0372 # 08 Y:2005 | 08 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,724 | $39,583 | Not Implemented |
UF0372 # 09 Y:2005 | 09 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $43,072 | $138,308 | Not Implemented |
UF0372 # 10 Y:2005 | 10 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $26,386 | $121,152 | Not Implemented |
UF0372 # 11 Y:2005 | 11 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,054 | $4,144 | Implemented |
UF0372 # 12 Y:2005 | 12 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,916 | $15,057 | Implemented |
UF0372 # 13 Y:2005 | 13 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $14,477 | $62,000 | Not Implemented |
UF0372 # 14 Y:2005 | 14 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,074,880 | $989 | Implemented |
MS0286 # 01 Y:2005 | 01 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $6,625 | $0 | Not Implemented |
AM0499 # 01 Y:2005 | 01 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,800 | $27,700 | Implemented |
AM0499 # 02 Y:2005 | 02 | 2005 | REUSE RAGS UNTIL COMPLETELY SOILED | $12,000 | $0 | Implemented |
AM0499 # 03 Y:2005 | 03 | 2005 | USE SYNTHETIC LUBRICANT | $11,335 | $0 | Implemented |
AM0499 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,110 | $2,800 | Implemented |
AM0499 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,975 | $0 | Implemented |