Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,517
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0500 # 05 Y:2005 | 05 | 2005 | IMPROVE LUBRICATION PRACTICES | $4,137 | $4,810 | n/a |
WI0500 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,252 | $2,032 | n/a |
WI0500 # 07 Y:2005 | 07 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,092 | $208 | n/a |
LE0225 # 01 Y:2005 | 01 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $28,200 | $2,000 | Not Implemented |
LE0225 # 02 Y:2005 | 02 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $17,500 | $50,000 | Implemented |
LE0225 # 03 Y:2005 | 03 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $11,161 | $2,800 | Not Implemented |
LE0225 # 04 Y:2005 | 04 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,707 | $200 | Implemented |
LE0225 # 05 Y:2005 | 05 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,158 | $800 | Not Implemented |
LE0225 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,558 | $100 | Implemented |
LE0225 # 07 Y:2005 | 07 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,914 | $2,500 | Implemented |
LE0225 # 08 Y:2005 | 08 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,118 | $350 | Not Implemented |
LE0225 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,090 | $35,595 | Implemented |
MA0588 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $3,404 | $2,197 | Implemented |
MA0588 # 02 Y:2005 | 02 | 2005 | USE MINIMUM STEAM OPERATING PRESSURE | $2,294 | $500 | Implemented |
MA0588 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,994 | $1,242 | Not Implemented |
MA0588 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,132 | $4,668 | Implemented |
MA0588 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $812 | $2,599 | Not Implemented |
TA0102 # 01 Y:2005 | 01 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $20,445 | $0 | Implemented |
TA0102 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,027 | $110 | Implemented |
TA0102 # 03 Y:2005 | 03 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,700 | $1,800 | Implemented |
TA0102 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,170 | $0 | Not Implemented |
TA0102 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $245 | $148 | Not Implemented |
UD0729 # 01 Y:2005 | 01 | 2005 | DEVELOP STANDARD OPERATING PROCEDURES | $256,000 | $110,000 | Not Implemented |
UD0729 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $113,219 | $13,700 | Not Implemented |
UD0729 # 03 Y:2005 | 03 | 2005 | USE PHOTOCELL CONTROLS | $99,594 | $0 | Not Implemented |