Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0095 # 13 Y:2005 13 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $5,283 $24,720 Not Implemented
AM0484 # 01 Y:2005 01 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $19,500 $700 Not Implemented
AM0484 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,500 $1,740 Implemented
AM0484 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,560 $360 Implemented
AM0484 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,000 $20 Implemented
AM0484 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $600 $0 Implemented
AM0484 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $410 $470 Not Implemented
AM0484 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $400 Implemented
UF0356 # 01 Y:2005 01 2005 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $0 $150,000 Not Implemented
UF0356 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,843 $21,108 Implemented
UF0356 # 03 Y:2005 03 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $6,348 $2,000 Implemented
UF0356 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,008 $700 Implemented
UF0356 # 05 Y:2005 05 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,918 $1,185 Not Implemented
UF0356 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,295 $2,194 Implemented
UF0356 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $1,232 $1,450 Implemented
UF0356 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96 $245 Implemented
UF0356 # 09 Y:2005 09 2005 RECYCLE FLUORESCENT LAMPS $0 $3,496 Implemented
TA0091 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,915 $975 Not Implemented
TA0091 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,600 $4,390 Not Implemented
TA0091 # 03 Y:2005 03 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,910 $2,332 Not Implemented
TA0091 # 04 Y:2005 04 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,750 $190 Not Implemented
TA0091 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $892 $117 Not Implemented
TA0091 # 06 Y:2005 06 2005 USE PHOTOCELL CONTROLS $520 $15 Not Implemented
LM0090 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,633 $0 Not Implemented
LM0090 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $429 $280 Implemented