IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,517

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0302 # 07 Y:2004 07 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,889 $80 Implemented
WV0302 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,260 $50 Implemented
WV0302 # 09 Y:2004 09 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,096 $1,967 Not Implemented
WV0302 # 10 Y:2004 10 2004 INSTALL OCCUPANCY SENSORS $921 $1,400 Implemented
WV0302 # 11 Y:2004 11 2004 DEVELOP A REPAIR/REPLACE POLICY $731 $300 Implemented
WV0302 # 12 Y:2004 12 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $28,080 $100 Implemented
WV0302 # 13 Y:2004 13 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,450 $5,000 Implemented
BD0266 # 01 Y:2004 01 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $260 $11,000 Implemented
BD0266 # 02 Y:2004 02 2004 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $6,225 $4,930 Implemented
BD0266 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,992 $600 Implemented
BD0266 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,081 $2,765 Implemented
BD0266 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $703 $1,425 Implemented
BD0266 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $504 $220 Implemented
BD0266 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $382 $323 Implemented
BD0266 # 08 Y:2004 08 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $329 $510 Implemented
BD0266 # 09 Y:2004 09 2004 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION $2,462 $1,575 Not Implemented
BD0266 # 10 Y:2004 10 2004 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,020 $96 Implemented
BD0266 # 11 Y:2004 11 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,200 $96 Implemented
BD0266 # 12 Y:2004 12 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,404 $2,500 Implemented
NC0288 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,564 $435 Implemented
NC0288 # 02 Y:2004 02 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,570 $1,725 Implemented
NC0288 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $239 $100 Implemented
NC0288 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $15,216 $3,800 Implemented
NC0288 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,010 $1,580 Not Implemented
NC0288 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $222 $178 Not Implemented