IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,512

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0293 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,889 $210 Implemented
WV0293 # 10 Y:2004 10 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,815 $3,000 Not Implemented
WV0293 # 11 Y:2004 11 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,657 $300 Implemented
WV0293 # 12 Y:2004 12 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $565 $1,100 Not Implemented
WV0293 # 13 Y:2004 13 2004 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $38,480 $1,900 Not Implemented
LM0074 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $3,094 $231 Implemented
LM0074 # 02 Y:2004 02 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,288 $1,000 Implemented
LM0074 # 03 Y:2004 03 2004 PAY BILLS ON TIME TO AVOID LATE FEES $392 $0 Implemented
LM0074 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,673 $125 Implemented
LM0074 # 05 Y:2004 05 2004 REPAIR AND ELIMINATE STEAM LEAKS $3,618 $4,000 Implemented
LM0074 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,439 $1,740 Implemented
LM0074 # 07 Y:2004 07 2004 INSTALL SKYLIGHTS $2,237 $300 Not Implemented
LM0074 # 08 Y:2004 08 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $21,938 $6,600 Implemented
LM0074 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $431 $0 Not Implemented
LM0074 # 10 Y:2004 10 2004 MODIFY WORKLOAD $41,860 $19,000 Implemented
UD0694 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $318,395 $324,700 Not Implemented
UD0694 # 02 Y:2004 02 2004 AIR CONDITION ONLY SPACE NECESSARY $295,125 $0 Implemented
UD0694 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $117,513 $80,244 Not Implemented
UD0694 # 04 Y:2004 04 2004 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $57,990 $114,000 Not Implemented
UD0694 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,763 $51,348 Implemented
UD0694 # 06 Y:2004 06 2004 REDUCE VENTILATION AIR $18,999 $0 Implemented
UD0694 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,530 $5,780 Implemented
UD0694 # 08 Y:2004 08 2004 USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER $4,207 $3,323 Not Implemented
UD0694 # 09 Y:2004 09 2004 UPGRADE CONTROLS ON COMPRESSORS $3,140 $0 Not Implemented
UD0694 # 10 Y:2004 10 2004 INSTALL OCCUPANCY SENSORS $1,427 $210 Implemented