IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,507

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0261 # 09 Y:2003 09 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $17,176 $375 Implemented
WV0261 # 10 Y:2003 10 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,291 $600 Implemented
WV0261 # 11 Y:2003 11 2003 BURN WASTE OIL FOR HEAT $2,391 $3,700 Not Implemented
TA0049 # 01 Y:2003 01 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $573,800 $108,000 Not Implemented
TA0049 # 02 Y:2003 02 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $27,239 $0 Implemented
TA0049 # 03 Y:2003 03 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,900 $0 Implemented
TA0049 # 04 Y:2003 04 2003 DISCONNECT BALLASTS $1,775 $3,096 Implemented
TA0049 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,088 $162 Implemented
UM0229 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,914 $100,000 Not Implemented
UM0229 # 02 Y:2003 02 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,030 $5,280 Not Implemented
UM0229 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,440 $6,423 Not Implemented
UM0229 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,970 $300 Not Implemented
WI0439 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $2,581 $5,500 Implemented
WI0439 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $537 $75 Not Implemented
WI0439 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $2,560 $9,600 Not Implemented
WI0439 # 04 Y:2003 04 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,921 $608 Not Implemented
WI0439 # 05 Y:2003 05 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,726 $0 Not Implemented
WI0439 # 06 Y:2003 06 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,084 $1,200 Not Implemented
SU0156 # 01 Y:2003 01 2003 RECOVER AND REUSE SPENT ACID BATHS $21,400 $1,800 Implemented
SU0156 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,081 $8,364 Implemented
SU0156 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $2,283 $995 Implemented
SU0156 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,534 $327 Implemented
SU0156 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,059 $0 Implemented
AS0346 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,888 $30 Implemented
AS0346 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,284 $30 Implemented