IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

448

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0509 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,690 $180 Implemented
IA0509 # 08 Y:2013 08 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $684 $870 Implemented
IA0509 # 09 Y:2013 09 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,925 $425 Implemented
OK0867 # 11 Y:2013 11 2013 INSULATE BARE EQUIPMENT $15 $44 Implemented
OK0867 # 10 Y:2013 10 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $74 $0 Not Implemented
OK0867 # 09 Y:2013 09 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,228 $4,333 Not Implemented
OK0867 # 08 Y:2013 08 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $346 $701 Implemented
OK0867 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $747 $1,909 Not Implemented
OK0867 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,712 $500 Implemented
OK0867 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,294 $2,444 Not Implemented
OK0867 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,837 $21,300 Implemented
OK0867 # 03 Y:2013 03 2013 INSTALL SET-BACK TIMERS $3,386 $894 Not Implemented
OK0867 # 02 Y:2013 02 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,208 $3,900 Implemented
OK0867 # 01 Y:2013 01 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,579 $6,400 Not Implemented
CO0675 # 01 Y:2013 01 2013 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $30,250 $172,320 Not Implemented
CO0675 # 02 Y:2013 02 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,730 $18,100 Not Implemented
CO0675 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $810 $1,280 Not Implemented
CO0675 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $270 $290 Implemented
LE0366 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $264,361 $119,173 Not Implemented
LE0366 # 02 Y:2013 02 2013 USE OPTIMUM THICKNESS INSULATION $45,077 $26,012 Not Implemented
LE0366 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $2,504 $1,586 Not Implemented
LE0366 # 04 Y:2013 04 2013 ELIMINATE/REDUCE AN OPERATION $13,661 $0 Not Implemented
LE0366 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $92,173 $61,200 Not Implemented
LE0366 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,758 $10,000 Not Implemented
LE0366 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,595 $169,520 Not Implemented