IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

448

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0366 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,664 $1,000 Not Implemented
LE0366 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,762 $6,498 Not Implemented
LE0366 # 10 Y:2013 10 2013 REPAIR AND ELIMINATE STEAM LEAKS $51,910 $52,314 Not Implemented
LE0366 # 11 Y:2013 11 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $17,390 $6,750 Not Implemented
LE0366 # 12 Y:2013 12 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $13,454 $60,000 Not Implemented
LE0366 # 13 Y:2013 13 2013 MOVE BOILER TO MORE EFFICIENT LOCATION $721 $2,000 Not Implemented
LE0366 # 14 Y:2013 14 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,188 $11,909 Not Implemented
LE0366 # 15 Y:2013 15 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,242 $2,400 Not Implemented
TT0116 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $1,609 $5,920 Not Implemented
TT0116 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $837 $763 Not Implemented
TT0116 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,077 $700 Not Implemented
TT0116 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,073 $12,258 Implemented
IA0506 # 01 Y:2013 01 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $24,332 $5,000 Not Implemented
IA0506 # 02 Y:2013 02 2013 COMBINE UTILITY METERS $31,535 $40,000 Not Implemented
IA0506 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $932 $500 Implemented
IA0506 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,271 $10,035 Implemented
IA0506 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $751 $4,480 Implemented
IA0506 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $444 $1,450 Implemented
IA0506 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $830 $177 Implemented
IA0506 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,278 $11,250 Not Implemented
IP0017 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $744 $0 Not Implemented
IP0017 # 02 Y:2013 02 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,701 $0 Implemented
IP0017 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $805 $0 Implemented
IP0017 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,167 $1,400 Implemented
IP0017 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,754 $409 Implemented