Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,947
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0320 # 01 Y:2021 | 01 | 2021 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $10,092 | $12,000 | Not Implemented |
MZ0320 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,821 | $240 | Implemented |
MZ0320 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,470 | $9,762 | Not Implemented |
MZ0320 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,708 | $15,605 | Implemented |
MZ0320 # 05 Y:2021 | 05 | 2021 | INSULATE BARE EQUIPMENT | $375 | $389 | Not Implemented |
MZ0320 # 06 Y:2021 | 06 | 2021 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $298 | $1,226 | Not Implemented |
MZ0320 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $279 | $360 | Implemented |
WM0171 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,582 | $3,000 | Implemented |
WM0171 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,815 | $1,500 | Implemented |
WM0171 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,771 | $1,090 | Not Implemented |
WM0171 # 04 Y:2021 | 04 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,638 | $0 | Not Implemented |
WM0171 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,567 | $844 | Implemented |
WM0171 # 06 Y:2021 | 06 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,495 | $5,000 | Not Implemented |
WM0171 # 07 Y:2021 | 07 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $682 | $2,268 | Implemented |
SF0578 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $342 | $0 | Implemented |
SF0578 # 02 Y:2021 | 02 | 2021 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $30,709 | $4,981 | Implemented |
SF0578 # 03 Y:2021 | 03 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,919 | $1,697 | Implemented |
SF0578 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,748 | $658 | Implemented |
SF0578 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,646 | $4,708 | Not Implemented |
SF0578 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,961 | $12,352 | Not Implemented |
SF0578 # 07 Y:2021 | 07 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,091 | $27,625 | Implemented |
SF0578 # 08 Y:2021 | 08 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,673 | $46,439 | Implemented |
UD1033 # 01 Y:2022 | 01 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $633 | $0 | Not Implemented |
UD1033 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,185 | $2,250 | Not Implemented |
UD1033 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $555 | $676 | Not Implemented |