Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,507
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2408 # 10 Y:2024 | 10 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $17,102 | $30,000 | n/a |
IC0305 # 01 Y:2024 | 01 | 2024 | INCREASE AMOUNT OF CONDENSATE RETURNED | $8,515 | $18,062 | n/a |
IC0305 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $28,145 | $2,500 | n/a |
IC0305 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,071 | $5,184 | n/a |
IC0305 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,798 | $190,030 | n/a |
IC0305 # 05 Y:2024 | 05 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $1,126 | $3,467 | n/a |
IC0305 # 06 Y:2024 | 06 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,506 | $0 | n/a |
IC0305 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $1,737 | $2,801 | n/a |
IC0305 # 08 Y:2024 | 08 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $241 | $0 | n/a |
IC0305 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $677 | $0 | n/a |
IC0305 # 10 Y:2024 | 10 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,048 | $5,899 | n/a |
IC0305 # 11 Y:2024 | 11 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $271 | $1,572 | n/a |
IC0305 # 12 Y:2024 | 12 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,840 | $2,566 | n/a |
NT0022 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,989 | $2,640 | n/a |
NT0022 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,667 | $0 | n/a |
NT0022 # 03 Y:2024 | 03 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $51,120 | $0 | n/a |
NT0022 # 04 Y:2024 | 04 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $20,667 | $46,524 | n/a |
NT0022 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $237 | $0 | n/a |
SJ0021 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $227,474 | $847,735 | n/a |
SJ0021 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $493 | $109 | n/a |
SJ0021 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,040 | $0 | n/a |
SJ0021 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,291 | $2,078 | n/a |
SJ0021 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,255 | $1,308 | n/a |
SJ0021 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,438 | $0 | n/a |
SJ0021 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,813 | $12,216 | n/a |