Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,034
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0061 # 03 Y:2024 | 03 | 2024 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,219 | $4,350 | n/a |
TR0061 # 05 Y:2024 | 05 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,297 | $728 | n/a |
TR0061 # 02 Y:2024 | 02 | 2024 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $9,288 | $17,929 | n/a |
TR0061 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $121,083 | $551,388 | n/a |
TR0061 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $16,588 | $55,200 | n/a |
NT0035 # 05 Y:2025 | 05 | 2025 | APPLY FOR INVESTMENT INCENTIVES | $7,352 | $5,000 | n/a |
NT0035 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,196 | $5,609 | n/a |
NT0035 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $150,000 | $38,900 | n/a |
NT0035 # 03 Y:2025 | 03 | 2025 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,000 | $5,300 | n/a |
NT0035 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $954 | $0 | n/a |
AM0927 # 05 Y:2024 | 05 | 2024 | USE SYNTHETIC LUBRICANT | $295 | $166 | n/a |
AM0927 # 01 Y:2024 | 01 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $86,006 | $120,000 | n/a |
AM0927 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $5,300 | $8,620 | n/a |
AM0927 # 02 Y:2024 | 02 | 2024 | REDESIGN PROCESS | $7,085 | $34,585 | n/a |
AM0927 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $841 | $166 | n/a |
NT0022 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,989 | $2,640 | Implemented |
NT0022 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $237 | $0 | Not Implemented |
NT0022 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,667 | $0 | Not Implemented |
NT0022 # 04 Y:2024 | 04 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $20,667 | $46,524 | Not Implemented |
NT0022 # 03 Y:2024 | 03 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $51,120 | $0 | Not Implemented |
AM0914 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,515 | $0 | n/a |
TR0057 # 04 Y:2023 | 04 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,006 | $2,500 | n/a |
AM0914 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $40,720 | $77,840 | n/a |
AM0914 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,190 | $2,260 | n/a |
TR0057 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,771 | $8,010 | n/a |