IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,058

matching recommendations
Reset
NAICS 3321 Forging and Stamping
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0306 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $828 $840 n/a
TT0306 # 03 Y:2024 03 2024 TREAT AND REUSE RINSE WATERS $3,460 $1,590 n/a
TT0306 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $819 $785 n/a
TT0306 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,784 $3,840 n/a
TT0306 # 02 Y:2024 02 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,348 $0 n/a
TT0306 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $917 $113 n/a
TT0306 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $1,321 $1,560 n/a
TT0306 # 10 Y:2024 10 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $494 $1,400 n/a
TT0306 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,347 $2,600 n/a
TT0306 # 09 Y:2024 09 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $650 $100 n/a
AS0560 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,025 $75,360 n/a
AS0560 # 03 Y:2023 03 2023 UPGRADE OBSOLETE EQUIPMENT $21,635 $819,000 n/a
AS0560 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,759 $9,900 n/a
AS0560 # 01 Y:2023 01 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $701,165 $7,692,249 n/a
AS0560 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $112 $414 n/a
AS0560 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $51,728 $659,540 n/a
WV0640 # 10 Y:2023 10 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,582 $5,558 Implemented
WV0640 # 07 Y:2023 07 2023 DEVELOP A REPAIR/REPLACE POLICY $3,201 $1,563 Implemented
WV0640 # 09 Y:2023 09 2023 UPGRADE CONTROLS ON COMPRESSORS $2,907 $11,135 Not Implemented
WV0640 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $930 $135 Implemented
WV0640 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,002 $9,194 Implemented
WV0640 # 12 Y:2023 12 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $66 $178 Implemented
WV0640 # 06 Y:2023 06 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,905 $1,500 Implemented
WV0640 # 03 Y:2023 03 2023 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $43,563 $209,750 Not Implemented
WV0640 # 01 Y:2023 01 2023 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $216,485 $812,825 Not Implemented