IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,062

matching recommendations
Reset
NAICS 3321 Forging and Stamping
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0002 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $18,621 $0 Implemented
IP0002 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,887 $0 Not Implemented
IP0002 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,515 $140 Implemented
IP0002 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,900 $1,320 Implemented
IP0002 # 05 Y:2012 05 2012 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $2,700 $1,250 Not Implemented
IP0002 # 06 Y:2012 06 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,124 $4,678 Implemented
IP0002 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $1,205 $1,430 Not Implemented
IP0002 # 08 Y:2012 08 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $760 $1,216 Not Implemented
DL0084 # 01 Y:2012 01 2012 ADJUST BURNERS FOR EFFICIENT OPERATION $1,825 $500 Implemented
DL0084 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,216 $35,000 Not Implemented
DL0084 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,919 $20 Not Implemented
DL0084 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,252 $20 Not Implemented
BD0403 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,988 $5,268 Implemented
BD0403 # 02 Y:2012 02 2012 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,936 $440 Not Implemented
BD0403 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,011 $150 Implemented
BD0403 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $756 $10 Implemented
BD0403 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $851 $450 Implemented
BD0403 # 06 Y:2012 06 2012 MINIMIZE WATER USAGE $763 $1,000 Implemented
BD0403 # 07 Y:2012 07 2012 SELL OIL TO RECYCLER $515 $160 Implemented
BD0403 # 08 Y:2012 08 2012 AUTOMATE PAYROLL SYSTEM $4,510 $1,500 Not Implemented
IC0190 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $537 $695 n/a
IC0190 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,115 $3,977 n/a
IC0190 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $963 $1,463 n/a
IC0190 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,842 $32,631 n/a
IC0190 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $766 $350 n/a