Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,062
matching recommendationsNAICS | 33211 | Forging and Stamping |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0296 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,352 | $400 | Not Implemented |
UM0296 # 05 Y:2006 | 05 | 2006 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $1,144 | $392 | Not Implemented |
UM0296 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $646 | $200 | Not Implemented |
UM0296 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $255 | $92 | Not Implemented |
AM0504 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,000 | $1,000 | Not Implemented |
AM0504 # 02 Y:2006 | 02 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,400 | $7,650 | Not Implemented |
AM0504 # 03 Y:2006 | 03 | 2006 | USE SYNTHETIC LUBRICANT | $1,155 | $0 | Not Implemented |
AM0504 # 04 Y:2006 | 04 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $686 | $0 | Not Implemented |
AM0504 # 05 Y:2006 | 05 | 2006 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $455 | $0 | Not Implemented |
AM0504 # 06 Y:2006 | 06 | 2006 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $420 | $0 | Not Implemented |
AM0504 # 07 Y:2006 | 07 | 2006 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $165 | $0 | Not Implemented |
UM0295 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $80,138 | $170,000 | Implemented |
UM0295 # 02 Y:2006 | 02 | 2006 | OPTIMIZE PLANT POWER FACTOR | $71,400 | $75,000 | Not Implemented |
UM0295 # 03 Y:2006 | 03 | 2006 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $15,365 | $1,130 | Not Implemented |
UM0295 # 04 Y:2006 | 04 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,656 | $5,250 | Not Implemented |
UM0295 # 05 Y:2006 | 05 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,859 | $2,400 | Not Implemented |
UM0295 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,040 | $1,200 | Implemented |
UM0295 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,767 | $13,877 | Not Implemented |
UM0295 # 08 Y:2006 | 08 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,259 | $3,080 | Not Implemented |
UM0295 # 09 Y:2006 | 09 | 2006 | INSULATE BARE EQUIPMENT | $1,316 | $1,860 | Not Implemented |
UM0295 # 10 Y:2006 | 10 | 2006 | USE PHOTOCELL CONTROLS | $878 | $736 | Not Implemented |
SD0375 # 01 Y:2006 | 01 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,903 | $13,350 | Implemented |
SD0375 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,954 | $7,595 | Not Implemented |
SD0375 # 03 Y:2006 | 03 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,356 | $14,145 | Not Implemented |
SD0375 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,793 | $3,000 | Implemented |