IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 33211 Forging and Stamping
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0750 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,208 $3,000 Not Implemented
MA0750 # 08 Y:2015 08 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $537 $100 Not Implemented
MA0750 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,138 $9,144 Not Implemented
MA0750 # 05 Y:2015 05 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $5,289 $2,500 Not Implemented
MA0750 # 03 Y:2015 03 2015 REDUCE VENTILATION AIR $15,229 $15,000 Not Implemented
MA0750 # 02 Y:2015 02 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,398 $7,000 Not Implemented
MA0750 # 01 Y:2015 01 2015 REDUCE VENTILATION AIR $18,184 $10,420 Not Implemented
MA0750 # 07 Y:2015 07 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $3,007 $1,500 Not Implemented
SD0511 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $812 $2,323 Not Implemented
SD0511 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $2,105 $1,508 Not Implemented
SD0511 # 04 Y:2015 04 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,296 $6,475 Not Implemented
SD0511 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,658 $2,000 Not Implemented
SD0511 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,418 $1,750 Not Implemented
SD0511 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,106 $21,000 Not Implemented
WM0069 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,822 $6,100 Implemented
WM0069 # 11 Y:2015 11 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,423 $1,600 Not Implemented
WM0069 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $1,379 $1,500 Not Implemented
WM0069 # 08 Y:2015 08 2015 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $6,282 $14,000 Not Implemented
WM0069 # 07 Y:2015 07 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,035 $855 Not Implemented
WM0069 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $27,723 $0 Implemented
WM0069 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,294 $2,400 Implemented
WM0069 # 04 Y:2015 04 2015 REPLACE BOILER $34,455 $6,500 Not Implemented
WM0069 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,322 $95,000 Not Implemented
WM0069 # 02 Y:2015 02 2015 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $30,131 $24,450 Implemented
WM0069 # 01 Y:2015 01 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $177,870 $500,000 Not Implemented