IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

371

matching recommendations
Reset
NAICS 332111 Iron and Steel Forging
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0067 # 07 Y:2004 07 2004 MODIFY WORKLOAD $45,760 $570 Implemented
LM0067 # 08 Y:2004 08 2004 MODIFY WORKLOAD $10,652 $5,500 Implemented
LM0067 # 09 Y:2004 09 2004 MODIFY WORKLOAD $81,000 $9,400 Implemented
LM0067 # 10 Y:2004 10 2004 MODIFY WORKLOAD $55,000 $500 Not Implemented
AM0448 # 01 Y:2003 01 2003 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,266,100 $805,000 Implemented
AM0448 # 02 Y:2003 02 2003 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $24,300 $5,730 Implemented
AM0448 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,000 $2,000 Implemented
AM0448 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,200 $1,550 Not Implemented
AM0448 # 05 Y:2003 05 2003 USE SYNTHETIC LUBRICANT $4,032 $0 Implemented
AM0448 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $2,200 $2,000 Implemented
AM0448 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,120 $25 Implemented
AM0448 # 08 Y:2003 08 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $500 $70 Implemented
AM0448 # 09 Y:2003 09 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,600 $0 Implemented
AM0448 # 10 Y:2003 10 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $13,780 $0 Implemented
SU0165 # 01 Y:2003 01 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $99,450 $110,400 Implemented
SU0165 # 02 Y:2003 02 2003 RECOVER AND REUSE SPENT ACID BATHS $30,138 $3,234 Implemented
SU0165 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,370 $17,064 Implemented
SU0165 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,503 $937 Implemented
SU0165 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $9,177 $20,736 Not Implemented
SU0165 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,763 $5,538 Not Implemented
SU0165 # 07 Y:2003 07 2003 UPGRADE CONTROLS ON COMPRESSORS $93,620 $94,691 Implemented
BD0237 # 01 Y:2003 01 2003 USE RADIANT HEATER FOR SPOT HEATING $32,297 $56,000 Not Implemented
BD0237 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $8,921 $5,000 Not Implemented
BD0237 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $4,857 $2,000 Not Implemented
BD0237 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,331 $0 Not Implemented