IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

121

matching recommendations
Reset
NAICS 332117 Powder Metallurgy Part Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0560 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $51,728 $659,540 n/a
AS0560 # 03 Y:2023 03 2023 UPGRADE OBSOLETE EQUIPMENT $21,635 $819,000 n/a
AS0560 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,025 $75,360 n/a
AS0560 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,759 $9,900 n/a
AS0560 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $112 $414 n/a
AS0560 # 01 Y:2023 01 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $701,165 $7,692,249 n/a
MU0008 # 05 Y:2022 05 2022 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $11,502 $0 Not Implemented
MU0008 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $263 $210 Not Implemented
MU0008 # 04 Y:2022 04 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $2,790 $580 Not Implemented
MU0008 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,317 $2,520 Implemented
MU0008 # 03 Y:2022 03 2022 USE OPTIMUM TEMPERATURE $168 $0 Implemented
SU0454 # 01 Y:2018 01 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,250 $2,600 Implemented
SU0454 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,562 $2,313 Implemented
SU0454 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $201 $168 Implemented
SU0454 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $631 $1,100 Implemented
SU0454 # 05 Y:2018 05 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $624 $702 Implemented
SU0454 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $609 $1,336 Implemented
IP0095 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $2,961 $1,093 Implemented
IP0095 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,356 $3,070 Implemented
IP0095 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,822 $835 Not Implemented
IP0095 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,327 $3,124 Not Implemented
IP0095 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,255 $11,125 Implemented
IP0095 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,023 $2,041 Implemented
IP0095 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,935 $25 Implemented
IP0095 # 08 Y:2018 08 2018 RECOVER WASTE HEAT FROM EQUIPMENT $13,700 $6,580 Not Implemented