IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

457

matching recommendations
Reset
NAICS 332119 Metal Crown, Closure, and Other Metal Stamping (except Automotive)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0355 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,370 $5,220 Implemented
WV0355 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,946 $4,000 Implemented
WV0355 # 11 Y:2007 11 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,728 $3,500 Not Implemented
WV0355 # 12 Y:2007 12 2007 USE SYNTHETIC LUBRICANT $5,378 $2,150 Not Implemented
WV0355 # 13 Y:2007 13 2007 DEVELOP A REPAIR/REPLACE POLICY $5,152 $1,973 Implemented
WV0355 # 14 Y:2007 14 2007 BURN WASTE OIL FOR HEAT $4,426 $3,700 Not Implemented
WV0355 # 15 Y:2007 15 2007 INSTALL OCCUPANCY SENSORS $2,673 $2,890 Implemented
WV0355 # 16 Y:2007 16 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,450 $0 Implemented
WV0355 # 17 Y:2007 17 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,148 $2,700 Implemented
WI0515 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,672 $64,000 Not Implemented
WI0515 # 02 Y:2006 02 2006 $10,200 $0 Implemented
WI0515 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,857 $3,600 Not Implemented
WI0515 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,559 $0 Implemented
WI0515 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,038 $1,280 Implemented
WI0515 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $0 Not Implemented
WI0515 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $907 $0 Not Implemented
WV0339 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,620 $11,160 Implemented
WV0339 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,951 $0 Implemented
WV0339 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $3,744 $990 Implemented
WV0339 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,721 $1,000 Not Implemented
WV0339 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,690 $8,160 Not Implemented
WV0339 # 06 Y:2006 06 2006 DEVELOP A REPAIR/REPLACE POLICY $2,245 $370 Implemented
WV0339 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,423 $100 Implemented
WV0339 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,363 $925 Not Implemented
WV0339 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,098 $1,270 Implemented