Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
457
matching recommendationsNAICS | 332119 | Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0509 # 04 Y:2021 | 04 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,037 | $8,000 | Implemented |
LE0509 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,633 | $9,000 | Implemented |
LE0503 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,633 | $50,000 | Implemented |
LE0503 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $11,108 | $45,000 | Implemented |
LE0503 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,254 | $17,500 | Implemented |
LE0503 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,126 | $15,100 | Implemented |
LE0503 # 05 Y:2021 | 05 | 2021 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $56,981 | $300,000 | Implemented |
WV0605 # 01 Y:2021 | 01 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $59,363 | $10,625 | Not Implemented |
WV0605 # 02 Y:2021 | 02 | 2021 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $37,902 | $115,920 | Not Implemented |
WV0605 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $29,737 | $10,000 | Not Implemented |
WV0605 # 04 Y:2021 | 04 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $20,502 | $2,155 | Not Implemented |
WV0605 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,719 | $125 | Implemented |
WV0605 # 06 Y:2021 | 06 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $14,806 | $683 | Implemented |
WV0605 # 07 Y:2021 | 07 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,015 | $4,100 | Implemented |
WV0605 # 08 Y:2021 | 08 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,600 | $1,326 | Implemented |
WV0605 # 09 Y:2021 | 09 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $10,833 | $1,500 | Implemented |
WV0605 # 10 Y:2021 | 10 | 2021 | INSTALL OCCUPANCY SENSORS | $8,864 | $20,709 | Not Implemented |
WV0605 # 11 Y:2021 | 11 | 2021 | INSULATE BARE EQUIPMENT | $6,929 | $10,915 | Not Implemented |
WV0605 # 12 Y:2021 | 12 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,500 | $30,000 | Not Implemented |
MI0362 # 10 Y:2019 | 10 | 2019 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $288 | $187 | Implemented |
MI0362 # 09 Y:2019 | 09 | 2019 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,147 | $1,090 | Implemented |
MI0362 # 08 Y:2019 | 08 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,148 | $1,126 | Implemented |
MI0362 # 07 Y:2019 | 07 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,481 | $185 | Implemented |
MI0362 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,851 | $160 | Not Implemented |
MI0362 # 05 Y:2019 | 05 | 2019 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,811 | $1,120 | Not Implemented |