IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
NAICS 332119 Metal Crown, Closure, and Other Metal Stamping (except Automotive)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0515 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,672 $64,000 Not Implemented
WI0515 # 02 Y:2006 02 2006 ELIMINATE SHIFT $10,200 $0 Implemented
WI0515 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,857 $3,600 Not Implemented
WI0515 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,559 $0 Implemented
WI0515 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,038 $1,280 Implemented
WI0515 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $0 Not Implemented
WI0515 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $907 $0 Not Implemented
WV0339 # 10 Y:2006 10 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $583 $150 Implemented
WV0339 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,620 $11,160 Implemented
WV0339 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,951 $0 Implemented
WV0339 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $3,744 $990 Implemented
WV0339 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,721 $1,000 Not Implemented
WV0339 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,690 $8,160 Not Implemented
WV0339 # 06 Y:2006 06 2006 DEVELOP A REPAIR/REPLACE POLICY $2,245 $370 Implemented
WV0339 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,423 $100 Implemented
WV0339 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,363 $925 Not Implemented
WV0339 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,098 $1,270 Implemented
WI0512 # 03 Y:2006 03 2006 USE EVAPORATION TO CONCENTRATE MATERIAL $24,691 $12,000 Not Implemented
WI0512 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $258 $150 Implemented
WI0512 # 06 Y:2006 06 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $843 $700 Implemented
WI0512 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,371 $3,200 Not Implemented
WI0512 # 04 Y:2006 04 2006 AUTOMATE PAYROLL SYSTEM $5,350 $0 Implemented
WI0512 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,679 $72,610 Implemented
WI0512 # 01 Y:2006 01 2006 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $554 $21,500 Not Implemented
UM0298 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $126 $92 Not Implemented