Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 33221 Cutlery and Handtool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0677 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $4,053 $200 Not Implemented
MA0677 # 03 Y:2011 03 2011 INSTALL TIMERS AND/OR THERMOSTATS $1,514 $5,967 Implemented
MA0677 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,225 $200 Implemented
MA0677 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $912 $8,300 Not Implemented
MA0677 # 06 Y:2011 06 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $362 $500 Implemented
MA0677 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $107 $100 Implemented
MA0677 # 01 Y:2011 01 2011 REDUCE VENTILATION AIR $9,048 $2,585 Implemented
WV0431 # 08 Y:2011 08 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,027 $1,560 Implemented
WV0431 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $2,808 $408 Implemented
WV0431 # 06 Y:2011 06 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,020 $0 Not Implemented
WV0431 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $6,207 $1,076 Implemented
WV0431 # 04 Y:2011 04 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,105 $1,850 Implemented
WV0431 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,355 $11,500 Not Implemented
WV0431 # 02 Y:2011 02 2011 USE OPTIMUM THICKNESS INSULATION $29,707 $75,000 Not Implemented
WV0431 # 01 Y:2011 01 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $135,254 $682,000 Implemented
MA0673 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $386 $450 Not Implemented
MA0673 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $743 $1,800 Not Implemented
MA0673 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,078 $200 Implemented
MA0673 # 05 Y:2011 05 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,432 $6,475 Not Implemented
MA0673 # 04 Y:2011 04 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,179 $8,435 Not Implemented
MA0673 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,772 $540 Implemented
MA0673 # 02 Y:2011 02 2011 USE MINIMUM SAFE OVEN VENTILATION $3,752 $490 Not Implemented
MA0673 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $4,145 $1,370 Implemented