IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
NAICS 332215 Metal Kitchen Cookware, Utensil, Cutlery, and Flatware (except Precious) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0199 # 05 Y:2018 05 2018 OPTIMIZE PLANT POWER FACTOR $1,129 $2,568 Not Implemented
UA0199 # 01 Y:2018 01 2018 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,877 $13,552 Implemented
UA0199 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,483 $9,013 Implemented
UA0199 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $3,453 $1,385 Not Implemented
UA0199 # 04 Y:2018 04 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,814 $5,948 Not Implemented
CO0733 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,020 $1,730 n/a
CO0733 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $750 n/a
CO0733 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,360 $5,950 n/a
CO0733 # 04 Y:2016 04 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,970 $34,800 n/a
CO0733 # 05 Y:2016 05 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,200 $500 n/a
CO0733 # 06 Y:2016 06 2016 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $2,200 $9,200 n/a
IA0551 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $527 $2,380 Not Implemented
IA0551 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,782 $23,025 Implemented
IA0551 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,938 $578 Implemented
IA0551 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,021 $2,627 Implemented
IA0551 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $989 $330 Implemented
IA0551 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $854 $70 Implemented
BS0023 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $49 $161 Implemented
BS0023 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $983 $2,950 Implemented
BS0023 # 03 Y:2013 03 2013 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,293 $61 Not Implemented
BS0023 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,676 $986 Implemented
BS0023 # 01 Y:2013 01 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,128 $10 Implemented
WV0441 # 02 Y:2012 02 2012 USE RADIANT HEATER FOR SPOT HEATING $78,225 $74,340 Not Implemented
WV0441 # 03 Y:2012 03 2012 UPGRADE CONTROLS ON COMPRESSORS $73,647 $33,378 Implemented
WV0441 # 01 Y:2012 01 2012 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $200,857 $610,000 Not Implemented