IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

274

matching recommendations
Reset
NAICS 332216 Saw Blade and Handtool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0431 # 06 Y:2011 06 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,020 $0 Not Implemented
WV0431 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $2,808 $408 Implemented
WV0431 # 08 Y:2011 08 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,027 $1,560 Implemented
MA0673 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $4,145 $1,370 Implemented
MA0673 # 02 Y:2011 02 2011 USE MINIMUM SAFE OVEN VENTILATION $3,752 $490 Not Implemented
MA0673 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,772 $540 Implemented
MA0673 # 04 Y:2011 04 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,179 $8,435 Not Implemented
MA0673 # 05 Y:2011 05 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,432 $6,475 Not Implemented
MA0673 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,078 $200 Implemented
MA0673 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $743 $1,800 Not Implemented
MA0673 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $386 $450 Not Implemented
MS0358 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,396 $19,479 Not Implemented
MS0358 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,710 $398 Not Implemented
MS0358 # 03 Y:2010 03 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,482 $274,410 Not Implemented
MS0358 # 04 Y:2010 04 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,420 $13,240 Not Implemented
MS0358 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,363 $6,334 Not Implemented
MS0358 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $682 $945 Not Implemented
MS0358 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $351 $1,687 Not Implemented
NC0401 # 01 Y:2010 01 2010 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,744 $3,600 Implemented
NC0401 # 02 Y:2010 02 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,833 $0 Implemented
NC0401 # 03 Y:2010 03 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,578 $0 Implemented
NC0401 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $1,940 $7,800 Implemented
NC0401 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $845 $200 Implemented
NC0401 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $4,947 $6,200 Implemented
NC0401 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $5,761 $3,750 Implemented