Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,176
matching recommendationsNAICS | 3323 | Architectural and Structural Metals Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0951 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $21,155 | $29,319 | Not Implemented |
GT0951 # 07 Y:2020 | 07 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,162 | $4,561 | Implemented |
GT0951 # 08 Y:2020 | 08 | 2020 | OPTIMIZE PLANT POWER FACTOR | $9,097 | $34,730 | Not Implemented |
GT0951 # 09 Y:2020 | 09 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $201,113 | $1,989,215 | Not Implemented |
MI0378 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,828 | $480 | Implemented |
MI0378 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,840 | $2,673 | Not Implemented |
MI0378 # 03 Y:2020 | 03 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $7,580 | $6,182 | Not Implemented |
MI0378 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,737 | $11,160 | Implemented |
MI0378 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,502 | $2,100 | Implemented |
MI0378 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,909 | $1,980 | Implemented |
MI0378 # 07 Y:2020 | 07 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,694 | $1,195 | Implemented |
MI0378 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $1,344 | $1,042 | Not Implemented |
MI0378 # 09 Y:2020 | 09 | 2020 | USE PHOTOCELL CONTROLS | $981 | $1,141 | Not Implemented |
MI0378 # 10 Y:2020 | 10 | 2020 | ISOLATE HOT OR COLD EQUIPMENT | $671 | $560 | Not Implemented |
NL0052 # 01 Y:2020 | 01 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $11,815 | $4,420 | Not Implemented |
NL0052 # 02 Y:2020 | 02 | 2020 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $5,190 | $6,320 | Not Implemented |
NL0052 # 03 Y:2020 | 03 | 2020 | METER WASTE WATER | $4,017 | $580 | Implemented |
NL0052 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,375 | $2,354 | Implemented |
NL0052 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,620 | $2,000 | Implemented |
NL0052 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $465 | $2,000 | Implemented |
SD0596 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,809 | $30,150 | Not Implemented |
SD0596 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,628 | $300 | Not Implemented |
SD0596 # 03 Y:2020 | 03 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,037 | $2,560 | Not Implemented |
SD0596 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,711 | $0 | Not Implemented |
AM0800 # 01 Y:2020 | 01 | 2020 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $487,100 | $3,000 | Implemented |