IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,153

matching recommendations
Reset
NAICS 3323 Architectural and Structural Metals Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0370 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,997 $4,187 Not Implemented
LE0370 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,755 $1,688 Not Implemented
LE0370 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,133 $15,100 Not Implemented
LE0370 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,137 $6,750 Not Implemented
LE0370 # 10 Y:2014 10 2014 REPLACE BOILER $61,996 $205,000 Not Implemented
LE0370 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,070 $75,880 Not Implemented
BD0435 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,612 $12,980 Implemented
BD0435 # 02 Y:2013 02 2013 USE PHOTOCELL CONTROLS $1,708 $500 Not Implemented
BD0435 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $654 $730 Implemented
BD0435 # 04 Y:2013 04 2013 USE RADIANT HEATER FOR SPOT HEATING $618 $2,100 Not Implemented
BD0435 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $287 $250 Not Implemented
IA0512 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,448 $356 Implemented
IA0512 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,848 $100 Implemented
IA0512 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,424 $70 Implemented
IA0512 # 04 Y:2013 04 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $629 $890 Not Implemented
IA0512 # 05 Y:2013 05 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $504 $530 Not Implemented
IA0512 # 06 Y:2013 06 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $277 $200 Implemented
IA0512 # 07 Y:2013 07 2013 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $17,286 $135,000 Not Implemented
UD0891 # 01 Y:2013 01 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $112,427 $100,000 Not Implemented
UD0891 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,664 $3,000 Implemented
UD0891 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $8,643 $30,000 Not Implemented
UD0891 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $868 $1,000 Implemented
UD0891 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,992 $27,380 Not Implemented
UD0891 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $641 $300 Not Implemented
IA0511 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $3,687 $4,550 Not Implemented