Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsNAICS | 3323 | Architectural and Structural Metals Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0120 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,227 | $410 | Implemented |
UU0120 # 04 Y:2017 | 04 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $12,184 | $800 | Implemented |
UU0120 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,587 | $61,481 | Implemented |
UU0120 # 07 Y:2017 | 07 | 2017 | INSTALL COMMON HEADER ON COMPRESSORS | $4,024 | $5,000 | Implemented |
UU0120 # 05 Y:2017 | 05 | 2017 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $6,334 | $400 | Implemented |
UU0120 # 01 Y:2017 | 01 | 2017 | CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS | $113,750 | $5,600 | Not Implemented |
UU0120 # 08 Y:2017 | 08 | 2017 | OPTIMIZE PLANT POWER FACTOR | $3,894 | $3,500 | Not Implemented |
UU0120 # 09 Y:2017 | 09 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,929 | $0 | Implemented |
UU0120 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $32,948 | $23,006 | Not Implemented |
UU0100 # 06 Y:2006 | 06 | 2006 | OPTIMIZE PLANT POWER FACTOR | $4,280 | $4,140 | Not Implemented |
UU0100 # 05 Y:2006 | 05 | 2006 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $15,000 | $10,000 | Not Implemented |
UU0100 # 04 Y:2006 | 04 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $290 | $740 | Not Implemented |
UU0100 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,490 | $165 | Not Implemented |
UU0100 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,510 | $830 | Not Implemented |
UU0100 # 01 Y:2006 | 01 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,720 | $10,000 | Not Implemented |
UU0096 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $840 | $330 | Not Implemented |
UU0096 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,320 | $5,000 | Not Implemented |
UU0096 # 03 Y:2005 | 03 | 2005 | USE PHOTOCELL CONTROLS | $2,530 | $2,040 | Not Implemented |
UU0096 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,320 | $1,950 | Not Implemented |
UU0096 # 05 Y:2005 | 05 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $9,000 | $0 | Not Implemented |
UU0058 # 08 Y:2004 | 08 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $584 | $0 | Not Implemented |
UU0058 # 07 Y:2004 | 07 | 2004 | COMBINE UTILITY METERS | $10,270 | $0 | Implemented |
UU0058 # 06 Y:2004 | 06 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,353 | $0 | Implemented |
UU0058 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,714 | $1,010 | Implemented |
UU0058 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,398 | $308 | Not Implemented |