Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
141
matching recommendationsNAICS | 3323 | Architectural and Structural Metals Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0426 # 04 Y:2016 | 04 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,322 | $780 | Implemented |
LE0426 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,840 | $1,000 | Implemented |
LE0426 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $454 | $1,300 | Not Implemented |
LE0426 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $179 | $780 | Implemented |
LE0426 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $3,070 | $3,000 | Not Implemented |
LE0426 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,376 | $16,500 | Not Implemented |
LE0426 # 11 Y:2016 | 11 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,435 | $12,000 | Implemented |
LE0426 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,562 | $2,000 | Implemented |
LE0426 # 03 Y:2016 | 03 | 2016 | REDUCE VENTILATION AIR | $102,120 | $52,500 | Not Implemented |
LE0426 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,579 | $13,747 | Implemented |
LE0426 # 06 Y:2016 | 06 | 2016 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $16,120 | $35,000 | Not Implemented |
CO0732 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,070 | $46,190 | n/a |
CO0732 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,690 | $840 | n/a |
CO0732 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,620 | $12,560 | n/a |
WM0091 # 01 Y:2016 | 01 | 2016 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $12,568 | $2,860 | Not Implemented |
WM0091 # 07 Y:2016 | 07 | 2016 | USE PHOTOCELL CONTROLS | $1,383 | $560 | Not Implemented |
WM0091 # 02 Y:2016 | 02 | 2016 | COMBINE UTILITY METERS | $8,777 | $30,000 | Not Implemented |
WM0091 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,795 | $1,501 | Not Implemented |
WM0091 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,051 | $230 | Implemented |
WM0091 # 04 Y:2016 | 04 | 2016 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,722 | $0 | Not Implemented |
WM0091 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $2,746 | $1,275 | Not Implemented |
SU0416 # 03 Y:2016 | 03 | 2016 | ELIMINATE/REDUCE AN OPERATION | $2,385 | $5,280 | Implemented |
SU0416 # 04 Y:2016 | 04 | 2016 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $969 | $2,348 | Implemented |
SU0416 # 05 Y:2016 | 05 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $124 | $418 | Implemented |
SU0416 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,930 | $18,947 | Implemented |