Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,079
matching recommendationsNAICS | 33231 | Plate Work and Fabricated Structural Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0515 # 08 Y:2015 | 08 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $948 | $3,375 | Not Implemented |
SD0515 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $931 | $3,050 | Not Implemented |
UD0928 # 01 Y:2015 | 01 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,389 | $0 | Not Implemented |
UD0928 # 02 Y:2015 | 02 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $153,677 | $48,000 | Not Implemented |
UD0928 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $314,492 | $152,750 | Not Implemented |
UD0928 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $2,735 | $12,995 | Not Implemented |
UD0928 # 05 Y:2015 | 05 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $52,184 | $105,000 | Not Implemented |
UD0928 # 06 Y:2015 | 06 | 2015 | COVER OPEN TANKS | $2,876 | $2,196 | Not Implemented |
UD0928 # 07 Y:2015 | 07 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $154,780 | $150,000 | Not Implemented |
UD0928 # 08 Y:2015 | 08 | 2015 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $11,986 | $18,300 | Not Implemented |
UD0928 # 09 Y:2015 | 09 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,264 | $30,000 | Not Implemented |
UD0928 # 10 Y:2015 | 10 | 2015 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $5,622 | $25,000 | Not Implemented |
UD0928 # 11 Y:2015 | 11 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,007 | $1,000 | Not Implemented |
UD0928 # 12 Y:2015 | 12 | 2015 | ADJUST PH FOR NEUTRALIZATION | $68,888 | $34,000 | Not Implemented |
MZ0186 # 01 Y:2015 | 01 | 2015 | INSTALL OCCUPANCY SENSORS | $5,513 | $5,100 | Implemented |
MZ0186 # 02 Y:2015 | 02 | 2015 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $5,641 | $18,600 | Not Implemented |
MZ0186 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,104 | $1,160 | Implemented |
MZ0186 # 04 Y:2015 | 04 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $83 | $0 | Implemented |
IA0531 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,301 | $10,600 | Not Implemented |
IA0531 # 02 Y:2015 | 02 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,788 | $70 | Implemented |
IA0531 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $388 | $35 | Implemented |
IA0531 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,040 | $100 | Implemented |
IA0531 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $321 | $1,383 | Not Implemented |
IA0531 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $910 | $2,314 | Not Implemented |
IA0531 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $475 | $1,776 | Implemented |